Key information
- Suitable for One person
- Rent until 31.07.2025 7500-7800 kr
- Rent from 01.08.2025 7500-7800 kr
- Total 14 housing units
- Notice period 2 months
- Size 15 m2
Facilities
- BathroomOwn
- KitchenShared by 7-8 people
- FurnitureNo
- AppliancesYes
- AdaptedNo

Single room with private bathroom
This housing type is suitable for you if you want your own bedroom and bathroom, but want to share a kitchen.
Furniture
The housing comes with a closet, but is otherwise unfurnished.
Flatmates
It is random which students you share with. They can come from all over the world, be of all genders and of different ages.
Living with others can be a great way to make new friends and acquaintances. This type of living is suitable for you if you are cooperative and flexible.
Kitchen
In the shared kitchen you can cook and get to know your neighbours. The kitchen is furnished with a table and chairs. In some places you will also find other furniture. The design and furnishings may vary from kitchen to kitchen.
The kitchen is typically in daily use by those who already live here. The tenants have a shared responsibility for cleaning. The tenants often agree to share some kitchen and cleaning equipment. It may therefore be best to wait until you move in to see what you need to get yourself.
Appliances
The housing comes with a stove, refrigerator, microwave and dishwasher.
Private bathroom
You have your own bathroom with a shower, sink and toilet.
Laundry
You will get access to the common laundry facilities. Read more about laundry and prices here.
It is not possible to install your own washing machine in your residence.
Bod
A storage unit is not included.
Address
This housing type can be found in Gjerdrums vei 10 D.
Floors
Floors in building D
Building D has a total of 11 floors. The entrance to the building is in U4.
The housings are located on floors U3 - U1 and 1 - 7.
Construction projects at Nydalen
We are building 450 new student housing units in Nydalen Student Village
We are building three new buildings north of the two buildings that currently make up Nydalen Student village. The construction project is expected to be completed by the end of 2025.
The structural framework has been assembled, and the roofs on all three buildings are now in place. Towards the summer of 2025, we will carry out facade installation and interior construction works. Examples of construction works that will create noise are cutting materials and drilling in concrete.
There will also be some work on the outdoor areas, and there will be noise from excavators at times.
Working hours and noise
The project will cause noise and dust. There may be occasional reduced access in some places.
Working hours are Monday – Friday between 07:00 – 19:00.
Works with water and sewage near Nydalen student village
Oslo Municipality is installing new public water and sewage pipes in Korsvollbakken and Maridalsveien. At the same time, they will be constructing new manholes.
The work will begin in at the end of March 2025 and is expected to be completed by July 2026.
There may be short periods of water outages during the works. These will normally last less than 6 hours and should be notified in advance.
The work will cause inconveniences such as reduced accessibility, construction traffic, noise, vibrations, dust, possible odours, and temporary brown water from the taps. Blasting work will be carried out in certain areas along the route.
About the pictures
The pictures above are only an example of what the layout and appearance of this housing type may be.
Some of the pictures are digitally furnished and styled to show how the room may look when furnished. Therefore, there may be some discrepancies in the size of the furniture in relation to the room.
The degree of wear and tear will vary from unit to unit. This means that the standard may be worse or better than the housing in the pictures.
Colours, flooring, fixtures and other things may also vary.
Rent
The price of the different units of this housing type may vary. The variation can be due to factors such as size, floor, standard, timing of pricing, and more. You will be given an exact rent price when you receive a housing offer.
The rent includes electricity/energy, heating, internet, stairwell cleaning, water, and hot water.
Tenants must provide their own router or network cable to connect to the internet.
Please note that the price is adjusted on August 1st each year.
The stated price applies to students who meet the criteria in our Allocation regulations. For other tenants, there will be an additional 20% added to the rent.
Terms and conditions
To apply for student housing with us, you have to meet the criteria in our Allocation Regulations.
Here you will find an updated example of the tenancy contract with attachments, where the rental terms are described.
When renting student housing through SiO, the Tenancy Act §11-2 on student housing applies. This means you have fewer rights as a tenant, compared to renting other types of housing.
The rental period is fixed-term and will end on a set date. Here you will find guidelines on how to apply for a new tenancy contract later.
Nydalen Student Village
The student village has a nice location in a central area close to Nydalen and Storo. Here you have walking distance to BI and Storo Storsenter, and hiking opportunities along the idyllic Akerselva.
Construction projects in Nydalen
We are building 450 new student housing units in Nydalen Student Village
We are building three new buildings. The construction project is expected to be completed by the end of 2025.
Buildings D and E will open October 2025
The structural framework has been assembled, and the roofs on all three buildings are now in place. Towards the summer of 2025, we will carry out facade installation and interior construction works. Examples of construction works that will create noise are cutting materials and drilling in concrete.
There will also be some work on the outdoor areas, and there will be noise from excavators at times.
Working hours and noise
The project will cause noise and dust. There may be occasional reduced access in some places.
Working hours are Monday – Friday between 07:00 – 19:00.
Works with water and sewage near Nydalen student village
Oslo Municipality is installing new public water and sewage pipes in Korsvollbakken and Maridalsveien. At the same time, they will be constructing new manholes.
The work will begin in at the end of March 2025 and is expected to be completed by July 2026.
There may be short periods of water outages during the works. These will normally last less than 6 hours and should be notified in advance.
The work will cause inconveniences such as reduced accessibility, construction traffic, noise, vibrations, dust, possible odours, and temporary brown water from the taps. Blasting work will be carried out in certain areas along the route.
Lifts
There are lifts in the buildings.
Public transport
Nydalen subway station and bus stop are a few minutes away. Storo subway station and tram stop are also nearby, in addition to Nydalen train station.
Bicycle parking
You can find bicycle parking in the student village.
Waste
There are waste bins outside near the entrance.
Remember to recycle all your trash!
You can read more about recycling in the municipality of Oslo here.